Installation of a PV-Biomass Integrated Power Generation Project at Lot 04081M MK07


Project: Installation of a PV-Biomass Integrated Power Generation Project at Lot 04081M MK07
Location: Shipyard Road, Singapore
Owner: CGNPC Solar-Biofuel Power
AIPEC Scope of Work: Water Treatment System Equipment and Piping Installation
Work Volume: Mechanical Equipment - 50 ton, Piping Work - 3,000 DB
Start: Mar 2014
Completion: Jul 2014