Instrumentation & Control System Installation Work for CGNPC Solar Biofuel Project


Project: Instrumentation & Control System Installation Work for CGNPC Solar Biofuel Project
Location: Shipyard Road, Singapore
Owner: CGNPC Solar-Biofuel Power
AIPEC Scope of Work: Power Plant Overall Instrument and Control System Installation
Work Volume: Cable tray - 120 ton; Control cable - 60 Km; Terminal points - 8,200 points; Instruments - 600 sets.
Start: May-14
Completion: Oct-14