Project References

Sinopec Singapore 80 kt/a Lube Oil&Grease Project(Electric Installation Works)


Project: Sinopec Singapore 80 kt/a Lube Oil&Grease Project(Electric Installation Works)
Location: Tuas South, Singapore
Owner: Sinopec
AIPEC Scope of Work: Electrical Installation Work - Area 120,130,140
Work Volume: Cable tray - 20 ton; Control cable - 56 Km; Terminal points - 5,200 points
Start: Feb-13
Completion: Dec-13