Project References

Installation of Electrical and Control system at COY.W (Zeon) @ Jurong Island PKG03


Project: Installation of Electrical and Control system at COY.W (Zeon) @ Jurong Island PKG03
Location: Jurong Island, Singapore
Owner: Tuas Power Utilities
AIPEC Scope of Work: Cable Pulling and Instrumentation Work
Work Volume: Cable tray - 15 ton; Electrical Cable - 6 Km, Control cable - 11 Km, Metering skids - 4 sets
Start: Oct-12
Completion: Jul-13