Project References

Installation of Electrical and Control System for Piping Work at COY.H (Pipe Line from AK Site at Tembusu Crescent to Dairen site at Tembusu Avenue) @ Jurong Island PKG03


Project: Installation of Electrical and Control System for Piping Work at COY.H (Pipe Line from AK Site at Tembusu Crescent to Dairen site at Tembusu Avenue) @ Jurong Island PKG03
Location: Jurong Island, Singapore
Owner: Tuas Power Utilities
AIPEC Scope of Work: Cable Pulling and Instrumentation Work
Work Volume: Cable tray - 20 ton; Electrical Cable - 5 Km, Control cable - 10 Km, Metering skids - 3 sets
Start: Dec-12
Completion: Mar-13